Your solution is our problem

Vladimirskaya

"Gold Gravity Recovery Plant" for the production of gold concentrate, which is smelted following leaching and electrolysis.

Production capacity: 15 t/h
Operating mode: 24 h/d
Raw material: pre-crushed gold ore, gold content 8.1 g/t

Major components supplied:

  • Ball mill 2.1 m x 6 m (within a closed circuit), Sepro
  • 2 Screens 3 'x 8', Sepro - Sizetec
  • Gold centrifuges 1 x SB 750, 2 x SB 1350, Falcon - Sepro
  • HC 350 Hydrocyclones, Multotec
  • Dewatering using thickeners and 27 m² vacuum belt filter, Roymec
  • 2 Gravity tables, model 2000, Holman
  • Pumps from PRO Eurasia's own PROPump range